WORLDAUTO AUCTIONGARAGE
WAA GARAGE / DEALER SELLER FIELD GUIDE

+$300 hoped-for price. −$92 waiting result.

A higher hoped-for price is not automatically a better waiting plan. Compare the added price with the added days on the same daily meter.

Clearer questions. Better preparation.
WORKED EXAMPLE · HYPOTHETICAL INPUTS

Compare complete plans, not price headlines.

Suppose selling today is represented by a $14,200 planning price, with $12,000 already invested and $300 selling costs in either route. Today's contribution is $14,200 − $12,000 − $300 = $1,900.00.

Both waiting plans below use the same hypothetical $28 daily holding cost. The later prices and timing are assumptions—not actual offers, market valuations, fee quotes, promised prices or guaranteed sale dates.

The higher price produces the lower result.

Two hypothetical waiting plans compared with selling today.
PlanHoped-for later priceWaitHolding costLater contributionVersus today
Plan A$14,800.0021 days$588.00$1,912.00+$12.00
Plan B$15,100.0035 days$980.00$1,820.00−$80.00

Plan A carrying cost is 21 × $28 = $588.00. Later contribution is $14,800 − $12,000 − $300 − $588 = $1,912.00, or $12 ahead of selling today.

Plan B carrying cost is 35 × $28 = $980.00. Later contribution is $15,100 − $12,000 − $300 − $980 = $1,820.00, or $80 behind.

Reconcile the change in one line.

Plan B adds $300.00 to the hoped-for price. It also adds 14 days, and 14 × $28 = $392.00 of holding cost. The net change is $300 − $392 = −$92, exactly matching the move from +$12 to −$80.

Existing investment and selling costs do not explain the difference because the same amounts appear in both waiting plans. If those costs would actually differ by route, enter or account for the difference instead of canceling it.

Use a change ledger before extending.

  1. Write the added hoped-for price: support it as a planning assumption; do not present it as a valuation.
  2. Write the added days: use a realistic review window, not an open-ended promise.
  3. Multiply by the same daily meter: include only supported time-dependent costs and avoid double counting.
  4. Compare the deltas: if added holding cost exceeds added hoped-for price, the extension worsens the model result.

Lot Clock compares entered assumptions. It cannot predict a buyer, a sale date, condition changes or a future price.

Run Plan A, then change two fields.

Start with the hypothetical 21-day plan. Change the later price to $15,100 and the wait to 35 days. The public Lot Clock model should move from $12 ahead to $80 behind.

YOUR NUMBERSSample inputs · edit everything
Estimated upside from waiting$12.00

Today’s contribution: $1,900.00

Later contribution: $1,912.00

Price increase
Cost of waiting
Extra days
21 days
Holding cost over that time
$588.00
Expected price increase
$600.00

The price increase lasts 21.4 extra days at your entered daily cost.

Every sample amount is hypothetical. The later prices and timing are planning assumptions, not offers, appraisals, guaranteed sale prices or promised sale dates. Build the daily holding-cost input from supported costs that change with time and avoid counting an expense twice. Existing investment and selling costs are identical in both routes. Contribution is before taxes, overhead and unentered costs. Reset sample restores the 21-day plan.

KEEP THE CHANGE LEDGER

A higher price can still be the worse wait.

Use Copy estimate or Print, then keep the added price, added days and daily-cost support with the decision.

Open the standalone Lot Clock ↗

All WAA Garage tools and stories →